Is OSC Right for Your Project?
Over the past 20-plus years of designing, building, delivering and installing off-site modular M/E systems, we have found the following factors indicate OSC is a viable choice. Mouse over each point for more details.
Complex Mechanical Systems
Complex systems can be fully assembled and bench tested, reducing commissioning times and startup issues.
Jobsite Constraints
OSC reduces on-site construction activity and disruption at the job site – particularly important with limited access environments.
Fast Construction Schedule
OSC is often chosen for schools and campus environments that must open for a new school year or semester.
Single Source Responsibility
OSC means a single source is responsible for all system elements from design, to construction to controls and commissioning.
Single Source Responsibility
OSC means a single source is responsible for all system elements from design, to construction to controls and commissioning.
Minimal Critical System Down-Time
The modular design of OSC systems expedites shipping and re-assembly with minimal disruption.