Case Studies
We are pleased to share a few examples of the Epsilon design-build and design-build-install solutions over the past several years. This is a representative sample and we are happy to provide examples that may be more relevant to your site or industry.

Montreign Casino Central Utility Plant
Challenge: Montreign Casino was building a new resort and entertainment campus in Monticello, New York. The campus would include a 90,000 sq. ft. casino, an 18-story luxury hotel, 27,000 sq. ft. of entertainment space, seven restaurants, and four bars. Given the need to support a…

From Abandoned Retail to Leading Medical Center
Challenge: NYU Langone Health had a goal – and a challenge. The organization wanted to build a new medical center in the Garden City community of Long Island, NY. However, land was hard to come by in this high-density region, and the typical cost escalations…

325 Main Super Skid Case Study
Challenge: Boston Properties was developing a new 18-story high-rise building to serve technology and life science tenants in the rapidly evolving innovation hub of Kendall Square in Cambridge, Massachusetts. They faced a very tight urban site, an aggressive schedule, and a labor force that was…

From Factory to Field: Educational Facility
Challenge: Renovations at a Texas elementary school did not allow room inside the building for new boilers and chilled water pumps. Solution: Epsilon designed and fabricated a standalone modular hot water boiler and chilled water distribution pump package with two 2,000 MBH hot water boilers…

18-Story Office Building Mechanical System
Challenge: An 18-story office building with more than 1.12 million square feet needed a full mechanical system renovation, with minimal disruption to tenants and adjacent properties. Solution: Integration partner HTS New York engaged Epsilon based on our past successes delivering modular central plant solutions. Together,…

Pharmaceutical Manufacturing Central Utility Plant
Challenge: Boehringer Ingelheim (BI) – a leading pharmaceutical company – was planning to construct a new central chilled water plant to replace an underperforming existing system. The project presented substantial technical challenges: the process system required a steady 27oF entering water temperature while accommodating drastic…

Medical Center Central Utility Plant
Challenge: Holy Cross Health planned to construct a new hospital facility that would include a full-service emergency department, maternity ward, surgical services, and psychiatric care – along with an adjacent medical office building. The 6-story, 237,000-square-foot, 78-bed facility would be the first new hospital in…

Telecommunications Central Utility Plant and Data Center
Challenge: A leading global telecommunications company had plans to build new office space and data center in the heart of its’ existing southern California corporate campus. These plans required an additional 2,800-tons of central cooling plant capacity, along with approximately 2MW of additional data center…

General Motors Paint Shop Cooling Plant
Challenge: The General Motors facility in Wentzville, MO had undergone multiple building and process expansions over many years. As a result, the site was left short on process cooling, threatening paint shop production in the hot summer conditions. And given…

TWA Hotel at JFK Airport
Challenge: After sitting unused for 14 years, the iconic mid-century TWA Flight Center terminal at the John F. Kennedy International Airport (originally built and opened in the 1960s) was converted into a state-of-the-art hotel complex, boasting 512 rooms, 200,000…