Epsilon News

Recent Install: Central Utility Plant

The Epsilon team recently installed the first phase of a modular, prefabricated central utility plant for a project in Florida. These cooling tower mezzanines are a great example of the time- and labor-saving benefits teams can achieve through the Epsilon approach. Each section includes all structural steel, piping, valves, power/controls conduit and conductors, and all ancillary systems. It’s a game changer!

This was another great project with our strategic partners at Offsite Construction Concepts (OCC).