This time-lapse video shows the installation of a central chilled-water plant for an industrial client in the mid-south region of the US, orchestrated by Epsilon’s Field Operations team. The plant shown here represents one phase of 57,000-tons of total chilled-water capacity provided by Epsilon, and was completed in approximately 10 weeks – significantly faster than the equivalent traditional field-built schedule, with far less on-site labor required, and a drastic reduction in site congestion for the construction team and client.