Epsilon NewsModular Plant ConstructionOff-Site ConstructionProject Update

Project Update #2:
Bank of Montreal Trading Floor

By June 5, 2020November 4th, 2021No Comments

From Factory Floor to Restaurant Roof

Epsilon recently completed installing a new 4-MW modular power plant at the Bank of Montreal trading floor in downtown Toronto financial district. The project included fitting modules to integrate the structural, architectural and electrical/mechanical systems.

The two-story generator package, scheduled to be on-line in 2021, includes diesel powered generators, switchgear, UPS systems and battery backup systems – along with substantial sound-attenuation and emissions control.  The design also includes an innovative exoskeleton system to support a glass façade to match the adjacent building.

Scroll down for more photos showcasing the project, from the initial modular assembly at our plant in Kingston, ON, to the fully full plant installation.

Pre Assembly

June 1, 2019

Pre Assembly

Enclosure completely assembled at the Epsilon Kingston, ON factory.  

Dunnage in place

June 15, 2019

Dunnage in place

Dunnage installed above financial building spanning about 400’ between dunnage supports.

Plant Installed

August 11, 2019

Plant Installed

Plant is installed on top of the dunnage.

Completed plant

September 21, 2019

Completed plant

The plant installation is complete and is features an aesthetically pleasing view from the street.

Aerial view

September 22, 2019

Aerial view

An aerial view of the completed enclosure.