Epsilon recently completed a major milestone for this new four MW power plant: fitting of modules to integrate the structural, architectural and electrical/mechanical systems. The modular power plant will serve the new Bank of Montreal (BMO) trading floor, located in the heart of the downtown...
Read More
The story of Epsilon’s central-utility/co-gen plant that serves the new TWA Hotel at JFK airport will be featured at the upcoming Lean Construction Institute (LCI) Congress, in a presentation titled “Overcoming Schedule Pressures and Site Constraints using Off Site Construction.” It’s a great story about...
Read More
GM Cooling Project Wentzville, MO Challenge The General Motors facility in Wentzville, MO had undergone multiple building and process expansions over many years. As a result, the site was left short on process cooling, threatening paint shop production in the hot summer conditions. And given...
Read More
Terminal to Hotel Conversion Jamaica, NY Challenge After sitting unused for 14 years, the iconic mid-century TWA Flight Center terminal at the John F. Kennedy International Airport (originally built and opened in the 1960s) was converted into a state-of-the-art hotel complex, boasting 512 rooms, 200,000...
Read More
Check out this skidded system we recently shipped for the Canadian National Defense Headquarters in Ottawa, Ontario. The 18,000 MBH gas fired boiler system includes (3) condensing boilers, (3) vertical inline primary boiler pumps, (2) double suction secondary pumps, air control equipment, all ancillary gas...
Read More