Fire pump packaged system

Recently Shipped: Fire Pump Package

The Epsilon team recently shipped a two-section modular fire pumping system for a client in the Midwest. Central to the system are two (2) 325-HP Clark diesel-powered fire pumps by Peerless. The package includes Epsilon’s HVAC controls, all piping, valves, and electrical distribution for a single-point connection. The enclosure shipped complete with fire alarm infrastructure

Recently Shipped & Installed: Super Skid

Epsilon recently shipped and installed a “Super Skid” prefabricated, modular mechanical system that will provide 2,200 tons of chilled water to support a repeat industrial client’s process expansion.  The system is made up of 5 skids, housing chillers, pumps, chemical treatment, and electrical gear.  The project team chose Off-Site Construction to meet an aggressive schedule

chilled water plant for EV battery factory

Recently Shipped: Chilled Water Plant for EV Battery Factory

Epsilon recently shipped a chilled water plant to support a new electric vehicle battery factory under construction. The project leadership team chose Epsilon and our Off-Site Construction (OSC) approach for two primary reasons: an aggressive construction schedule and scarce specialty-trade labor. Epsilon’s leveraging of proven designs helped accelerate the overall schedule by eliminating multiple design

Updated: Recently Shipped – Mechanical Penthouse Phase 1

Epsilon recently shipped the first phase of a penthouse mechanical room for a pharmaceutical client in the northeast United States. The initial phase includes hot water boilers, pumps, and steam generation.  Stay tuned for updates on subsequent phases that will include air handler integration. Epsilon’s Field Operations team is orchestrating the turnkey installation of all

Recently Shipped: Four-Module Central Cooling and Heating Plant

Epsilon recently shipped this four-module central cooling and heating plant, bound for the mid-Atlantic as part of Operation Warp Speed’s vaccine production operations. Systems include steam boilers, tanks, pumps, and the support steel for three adjacent air-cooled chillers. Click on each image to see a larger version.

Forklift moving modular plant component

Recently Shipped: Central Utility Plant

From design to manufacturing to shipping – this week a 5,200 sq ft central utility plant heads to an industrial client in the Mid-Atlantic area of the US. The system includes 3,200 Tons of chilled water, 18,400 GPM of hydronic pumping capacity, and switchgear for normal and emergency power distribution. This is the first of

Chiller Plant Construction Crosses Two International Boundaries

Epsilon recently began field-installation of a large Off-Site Constructed (OSC) process chilled water system for an automotive plant in Coahuila State, Mexico. This 6,000 ton system (seen here in our final assembly plant in Kingston, Ontario, prior to shipment) is configured to standards developed for this client on prior Epsilon projects; not only is it

skid-mounted heat and pumping station

Recently Shipped: Three-Module Heating/Pumping Skid Package

From Concept to Reality:  We recently shipped this three-module heating/pumping skid package for a new campus building at New York University (NYU) located at 181 Mercer St. in New York City.  The system includes pumping for chilled-water (14 kgpm), heating hot-water (2.7 kgpm) and domestic hot-water (2 kgpm), along with integral heat exchangers and extensive

Recently Shipped: Skidded Gas Fired Boiler System

Check out this skidded system we recently shipped for the Canadian National Defense Headquarters in Ottawa, Ontario.  The 18,000 MBH gas fired boiler system includes (3) condensing boilers, (3) vertical inline primary boiler pumps, (2) double suction secondary pumps, air control equipment, all ancillary gas and hydronic piping, a single point electrical system and a