Epsilon Fabrication News

Project Updates: Commissioning Chiller Plants

Epsilon’s Field Operations team recently finished commissioning a series of water-cooled chiller plants across the Mid-Atlantic. By leveraging our in-house expertise in controls and system testing, we ensured these complex facilities exceeded performance expectations. Great work to everyone involved!

Water-Cooled Chiller Plant Time-Lapse

Water-Cooled Chiller Plant Time-Lapse

We are pleased to share this time-lapse video of a water-cooled chiller plant that Epsilon designed and built to serve a smaller-scale edge data center for a client in the mid-south.

Kyle Mostat speaking Adv Mfg Dec 2024

Epsilon Dispels OSC Myths in Upcoming Conference Presentation

This December in Phoenix, Epsilon’s Kyle Mostat will be one of the speakers at the Advanced Manufacturing Facility Construction West Conference. Kyle will share his insights during the Streamlining Operations with Trade Contractors track on day two of the event. For those who can’t make the conference, here’s a sneak peek at some of the

Fire pump packaged system

Recently Shipped: Fire Pump Package

The Epsilon team recently shipped a two-section modular fire pumping system for a client in the Midwest. Central to the system are two (2) 325-HP Clark diesel-powered fire pumps by Peerless. The package includes Epsilon’s HVAC controls, all piping, valves, and electrical distribution for a single-point connection. The enclosure shipped complete with fire alarm infrastructure

chilled water plant for EV battery factory

Recently Shipped: Chilled Water Plant for EV Battery Factory

Epsilon recently shipped a chilled water plant to support a new electric vehicle battery factory under construction. The project leadership team chose Epsilon and our Off-Site Construction (OSC) approach for two primary reasons: an aggressive construction schedule and scarce specialty-trade labor. Epsilon’s leveraging of proven designs helped accelerate the overall schedule by eliminating multiple design

Epsilon welding off-site construction module

The Epsilon Approach: In-House Engineering and Fabrication

This is the second in a series of articles that provides insight into the Epsilon approach and why we do what we do: the design, fabrication, assembly and installation of Off-Site Constructed (OSC) central utility systems. With more than 20 years of proven experience designing and manufacturing complex mechanical systems, we’ve developed a core approach

Modular Central Utility Plant for Automotive Manufacturer

Project announcement: Modular Central Utility Plant for Automotive Manufacturer

Epsilon is pleased to announce it is providing a chilled water plant that will deliver seasonal cooling for a major automotive manufacturer’s production plant in the Central U.S. This fully-integrated, offsite-constructed system will provide 7,500 tons of chilled water from five Trane centrifugal chillers, and includes a full substation to feed all equipment to this

The Epsilon Approach: Vendor Agnosticity

This is the first in a series of articles that will provide a bit more insight into the Epsilon approach and why we do what we do:  the design, fabrication, assembly and installation of Off Site Constructed central utility systems. With more than 20 years of proven experience designing and manufacturing these central utility systems,

pre-piped steam vestibule

Recently Installed: Prefabricated Steam Vestibule

We recently worked with HTS New York to provide an off-site constructed pre-piped steam vestibule for air handling units being installed at South Shore University Hospital. The vestibule reduced the complex steam piping installation that would have been required in the field, which expedited the overall project schedule – always an important consideration when doing

Next